LBUD reviews plumbing plans for compliance with backflow requirements. Water service sizing will be confirmed during backflow plan check. The Plumbing or Mechanical Engineer must determine the peak demand and size of the service(s).
Projects with no setbacks (“zero-property-line buildings”) require special attention to locate DCDA’s and water meter assemblies sized four inches and greater.