Construction Meter Request

Temporary water services, whether from a fire hydrant, recycled water filling station, or otherwise are installed at the discretion of the Department for the convenience and use by individuals, contractors and companies doing work of a limited duration.

Construction Water Meter installation

Please consider the following when applying:

  • Location of water use site is required.
  • Company checks accepted. No personal checks. Checks must clear before meter is installed.
  • Application requires Federal Tax ID #, Long Beach Business License #, and Business Card.
  • Contractor is responsible to lock and secure meter.
  • Prior to being approved for a recycled water connection, truck drivers or site supervisors must attend a short (15 minute) tailgate training.
  • Please anticipate 48 hours for application processing.

CLICK HERE FOR MORE INFORMATION AND METERING REQUIREMENTS(PDF, 155KB)

Click the button to fill out the application form through LB Utilities’ online portal, Laserfiche.

CONSTRUCTION METER REQUEST APPLICATION FORM

For applicable fees, see LB Utilities' Rules & Regulations(PDF, 868KB). The installation fixed fee is based on the size of the meter being requested. Prepare a check for the required amount made payable to Long Beach Utilities.